2022-10-18 | Oiling the Deck and Organizing the Salon

October 18th, 2022
Sunny and calm.
Santa Cruz de Tenerife

The yard started piling the deck today. I’ll head to a hotel to let it soak in overnight at the end of the day. Too much teak to get done in one shift, parts of the deck will still be getting done a couple days from now.

Reorganizing the salon and continuing to pull old equipment that will be replaced. Falkor’s old heart came out today. A seven cable box; each cable with multiple wires. There must have been thirty connections to the relays inside. Absolutely old school.

It seems like there are still miles of wires and cables to sort and pull, but space is opening up.